top of page
CB_Builders-3 SMALL.jpg

ARCHITECTURE

New Construction - FROM THE GROUND UP, CONCEPTS AND DESIGN. MODERN FLOOR PLANS FOR HIGH END CONTEMPORARY HOMES THAT TAKE INTO ACCOUNT EVERY DETAIL.

Addition, Remodel - CONTEMPORARY TRANSFORMATIONS TO MAKE YOUR HOME FIT YOUR LIFE

Restaurants - DESIGN CONCEPTS TURNED INTO PATRON-WORTHY REALITY, GETTING A RESTAURANT OFF THE GROUND AND OPENED ON TIME IS CRITICAL

Hospitality - UPSCALE BOUTIQUE DESIGNS TO CREATE UNIQUE, MODERN HOTEL AND AIRBNB EXPERIENCES

Retail - HIGH END RETAIL SHOP DESIGN, INTERIOR DESIGN, AND STOREFRONT DESIGN. MODERN DESIGN FOR A ONE OF A KIND EXPERIENCE AND SENSE OF PLACE WITH ATTENTION TO BRANDING

Office - NEW CONSTRUCTION OFFICE BUILDINGS, SMALL OFFICE DESIGN AND LAYOUT, TENANT BUILD-OUT, INTERIOR DESIGN. OFFICES THAT INCREASE PRODUCTIVITY WITH WELL DESIGNED SURROUNDINGS AND BUILT ENVIRONMENTS CRUCIAL TO WORKPLACE WELL BEING. 

NOTE: residential design fees are typically 5-10% of construction costs, depending on scope of work

FishboneHouseFirstFlrPlan.jpg

Design and Construction Documents: 3-9  months

This includes design, refinements, and documentation, as well as the time needed for any engineers to complete their work. If your project is in a historic district or HOA the timeline may extend based on specific or additional requirements for their approval.

Schematic Design

‍Informed by the site, context, and/or history, Schematic Design focuses on your needs/wants, the experience of the home, the home's relationship to the site, and the overall design concept of the home. This phase involves 2D & 3D for site planning, floor plans and exteriors to convey overall intent and massing. Meetings are used to discuss the design(s) and refine them until we create the best solution. 

‍Design Development

‍Design Development is when the “look” or “style” of the home is defined; materials are chosen and details are discussed and developed in 2-D drawings with some 3-D renderings of main spaces.

Construction Documents

‍Construction Documents are the final deliverable you receive, including consultants such as structural,  MEP (Mechanical, Electrical, and Plumbing), etc. These detailed plans are used by General Contractors to price the design and obtain Building Permits.

Building Permitting: 1-2 months

The time necessary for permitting is dependent on the the local jurisdiction and varies based on how well they are staffed and how many projects they are reviewing. 

Construction: 12-18  months

Construction for a new home typically takes 12-18 months, but can take more time based on the size, complexity, and location of the project. The General Contractor is responsible for the project schedule, but estimating 12-18 months for construction is a good start. 

Construction Administration:

During construction, the architect makes periodic site visits, as needed, to insure the project is being built to the aesthetic intent of the Construction Documents.

Fee Structure:

The architectural design fee is a flat fee that gets you the complete construction documents ready for permit/construction. Construction Administration is provided on an hourly rate basis. 

HOME RENOVATION IS SCARY...THANKFULLY WE CHOSE ANGIE TO BE OUR ARCHITECT AND IT MADE EVERYTHING SO MUCH EASIER

"Doing a home renovation is scary. Thankfully we chose Angie to be our architect and it made everything so much easier. She listened to us and gave us more than we knew we needed, all while being delightful and reassuring throughout the process. On top of the excellent work, the open lines of communication and willingness to answer our questions in a way we understood made it all way less scary."

Tyler & Natalie. Ann Arbor MI

michigan architectural firms interior designers in michigan architect near me architect birmingham michigan detroit architecture ann arbor architects contemporary interior home design
bottom of page